04 MOQ & ordering

MCT powder: MOQ, packaging and ordering

Technical document 04 · Reviewed 2026-11-19 · MCT Powder

On this page
  1. Why the minimum is 1 kg
  2. Packs and what they protect
  3. Lead time and what sits behind it
  4. Six details a quotation needs
  5. Samples and qualification
  6. Terms to settle before the PO

The minimum order for this MCT powder is 1 kg, in a foil pouch. That pack is a qualification unit: it is enough for a bench trial and a small pilot, and small enough to test a lot before a 25 kg drum is committed. Lead time is 1–7 days for a released lot. A 70% grade or an agglomerated version is made against its own specification and should be scheduled separately, not assumed inside the standard window.

In one line

One kilogram is the qualification unit; the 25 kg drum is the same material in a production pack, and the quotation is built on the specification, not on the pack size alone.

Why the minimum is 1 kg

A 1 kg pouch is large enough to run a dispersion trial, a stick or capsule fill trial, and a small stability arm, with material left for a retained sample. It is also small enough that a buyer can compare two lots or two oil loads without carrying a drum. The unit is drawn from a released lot, so the COA that comes with it describes the material in the bag.

The 25 kg drum is not a different product. It is the same powder in a production pack, with the same lot code system and the same certificate. The step from pouch to drum is a scale decision, not a specification change. A buyer who has qualified the 1 kg lot can move to the drum without reopening the formulation, provided the drum is from the same specification and a lot COA is supplied.

Packs and what they protect

Pack options · what each unit is for
PackTypical useWhat to confirm
1 kg foil pouchSample, bench trial, small pilotSeam, barrier film, lot label, reseal
25 kg fiber drumProduction run, blendingInner liner, closure, pallet and storage

Both packs should carry the product name, oil load, C8/C10 range, carrier, lot code, production date, shelf-life date and storage condition. The label should not stop at the product name: the oil load and the C8/C10 profile are the two lines that let a warehouse check the bag against the purchase order.

The pack is part of the stability case. A foil pouch and a fiber drum with a liner are barriers; a bag that is folded over is not. If the destination is humid, ask for the barrier specification and a desiccant policy before the order, not after the first caking complaint.

Lead time and what sits behind it

The 1–7 day figure applies to a released lot in a standard pack. It covers picking, labelling and the document pack; it does not cover the forwarder or customs. A destination outside the country adds transit time that the supplier does not control.

A 70% grade, an agglomerated grade or a custom carrier is a production order. The lead time depends on the run schedule and the specification, and it should be quoted with the order rather than borrowed from the standard grade. Ask for the release date and the COA date before the shipment is booked; a certificate issued after the goods arrive is a different document flow.

Six details a quotation needs

A quotation is only comparable when it names the material. Six details make that possible.

Six details to put in a quotation request
DetailWhat to state
Product and oil loadMicroencapsulated MCT oil powder, 50% or 70%
ProfileC8 55–65% and C10 35–45% of oil by GC, or the profile you require
Quantity and pack1 kg pouch, 25 kg drum, or both
DestinationCountry and postcode, for the document and delivery route
ApplicationStick, capsule, blend or beverage, so the mesh and carrier fit
Documents and timingCOA, TDS, SDS, allergen statement; required delivery date

The reply should state the specification, the pack, the lead time and the documents included. It should not leave the oil load or the C8/C10 basis to a later email; those are the lines that decide whether the material fits the label.

Samples and qualification

The 1 kg pouch is the practical sample size because it is the smallest unit released from a lot. Ask for the lot COA with the sample, and test the things the certificate cannot show: how the powder disperses in the intended liquid, whether it floats or sinks, how it tastes at the intended dose, and how it flows in the filling line. Keep a retained portion of the sample; if a later drum behaves differently, the retained pouch is the reference.

A sample from a pilot batch is useful for development, but it is not a release sample. Ask whether the sample is from a production lot and whether the COA is a release certificate or a development report.

Terms to settle before the PO

Put the specification on the purchase order, including the oil load, the C8/C10 basis, the carrier, moisture, PV and mesh. Name the document pack and the acceptance route. Agree the shelf life and the storage condition at delivery, and the lot traceability requirement: one lot code across the COA, the pack and the retained sample.

Agree how a result outside the specification is handled, how a retest is arranged and how a replacement lot is issued. If the order is for a 70% grade or an agglomerated version, attach its own specification rather than the 50% catalog sheet.

The grade page sets out the load options; the compliance page lists the documents a market may ask for; the COA page explains the certificate lines. The product page carries the catalog specification and the lead-time glossary entry defines the term.

Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.

Request a quotation