Packing & logistics

The pack is part of the specification.

A liner, a seal and a lot label decide whether the powder that left the warehouse is the powder that reaches the dose room. Packing and export documents are quoted with the grade, not after it.

Standard packs

Two packs, one lot record.

PackUseDetail
1 kg foil pouchTrial, sample, small batchFood-grade liner, sealed, lot label
25 kg fiber drumProductionFood-grade liner, tamper-evident seal, lot label
PalletBulk shipmentStretch-wrapped, labels visible, pallet record

The liner is not an accessory. A drum without a sealed food-grade liner is a different storage condition, and the stability data for the pack may no longer apply.

What ships with the drum

  • Batch COA against the agreed specification.
  • Technical data sheet and safety data sheet.
  • Allergen, GMO and origin statements.
  • Residual-solvent statement.
  • Packing list, lot label and, where required, a certificate of origin.

Export

Documents follow the destination.

Incoterm, packing list, certificate of origin and any destination-specific declaration are quoted with the order. The document list is agreed before the lot ships; it is not assembled after the container is booked.

  • Commercial invoice and packing list matched to the lot numbers.
  • Certificate of origin where the destination requires one.
  • Food-grade declaration and, where applicable, halal or kosher documentation for the grade and facility covered.
  • Third-party inspection or sampling arranged on request before shipment.

What can delay a shipment

Three avoidable causes

  1. A specification that changes after the lot is packed.
  2. A document requirement that was not in the first brief.
  3. A destination rule that needs a test or a licence not yet arranged.

Naming all three in the first email is the fastest way to shorten the lead time. The ordering page lists the six details a quotation needs.

Next step

Quote the pack with the grade.

Tell us the destination, the quantity and the document list. We will quote the pack, the lead time and the export documents together.