Lead Time
The interval between a confirmed order and dispatch.
Definition
Lead time is the time from order confirmation and document agreement to dispatch, not the transit time to the destination. It depends on whether the grade is held in stock, whether a lot has to be released, and whether the packaging or documentation is non-standard. Transit time is quoted separately, because it depends on the route and the Incoterm.
For a released magnesium bisglycinate lot, dispatch is normally measured in days rather than weeks, and the exact window is confirmed in the quotation. A custom particle size, a granulation or a market-specific document set can extend it because the lot is produced or tested first. The quoted lead time should start from the date the specification and documents are agreed, not from the enquiry.
Why it matters in a specification
- It sets the date the production schedule can rely on.
- It separates warehouse dispatch from freight transit, which are often confused.
- It changes with grade and documents, so a single figure for every order is unreliable.
What to ask a supplier
- Does the lead time start at order confirmation or at document approval?
- Is the material in stock as the specified grade and packaging?
- Which documents have to be issued before dispatch?
Where it appears
- Magnesium Bisglycinate — 1:2 magnesium–glycine chelate, anhydrous basis.
Related terms
If a term in your specification is ambiguous, send the document and we will name the definition we would use.
Request a specification review