04 MOQ & ordering

Pea protein peptides: MOQ, packaging and ordering

Technical document 04 · Reviewed 2026-11-19 · Pea Protein Peptides

On this page
  1. Why one kilogram is the minimum
  2. Packs, formats and pack identity
  3. How the lead time is built
  4. Six items for a firm quotation
  5. The sample should carry a lot code
  6. Terms to settle early

Pea protein peptides ship at a 1 kg minimum in a foil pouch, with a 25 kg fiber drum as the bulk pack. Quoted lead time for the standard powder is 1–7 days, and a firm offer needs six details: the material, the specification, the pack and quantity, the destination and Incoterm, the paperwork, and the market where it will be sold.

In one line

The 1 kg pouch is the minimum because it is the smallest unit that can carry its own lot code, certificate and retained sample.

Why one kilogram is the minimum

Small enough to air-freight and large enough to test, a 1 kg pack can supply a bench trial, a retained sample and an outside laboratory from one lot. It also travels with its own code, so the certificate can be tied to the bag that arrived. Splitting below 1 kg means repacking from a larger lot: more handling, a new identity and a weaker traceability chain, with the same chemistry inside.

The 25 kg drum exists for production. Handling per kilogram falls, but stock and storage time rise, and a hygroscopic powder left open in a humid room is a liability rather than a bargain. The minimum is a property of the pack, not a sales threshold.

Packs, formats and pack identity

Standard pea protein peptide packs
PackNet weightTypical useNotes
Foil pouch1 kgTrial, sample, small batchMoisture barrier; reseal or transfer after opening
Fiber drum25 kgProductionInner liner; lot code on drum and liner
Granulated powderOn requestFlow and dust controlParticle profile and bulk density change

The catalog powder passes ≥95% through 80 mesh. Granulation is a separate particle specification, not a different bag: flow, dust, wetting and capsule fill weight all move, and it is quoted on its own line. If the filling line cannot run the 80 mesh powder, say so before the quotation; a coarser or granulated grade changes the particle specification.

How the lead time is built

Quoted lead time for the standard pack is 1–7 days from order confirmation. Picking, paperwork and dispatch sit inside that window; freight transit, customs and the buyer's own quality release do not. A custom granulation or a non-standard pack needs extra time, listed separately on the quotation.

Ask when the lot will leave, not only how long the lead time is. A drum usually moves on a pallet, a pouch as a parcel, and the Incoterm fixes who books the freight and who clears the entry. Paperwork should move with the consignment rather than follow it.

Six items for a firm quotation

Six items make a quotation firm enough to compare:

  1. Material and source. Pea protein peptides, with the base protein and the hydrolysis route named.
  2. Specification. Protein with its factor and basis, peptide content with its method and cut-off, ash, moisture and mesh.
  3. Quantity and pack. One pouch, one drum, or a granulated grade.
  4. Destination and Incoterm. The destination country, the port or address, and the agreed trade term.
  5. Documents. COA, specification, SDS, allergen and GMO statements, and any market-specific declaration.
  6. Intended use and market. Whether it is a supplement, a food or another use, and where it will be sold.

A quotation that leaves out the market or the base protein cannot be compared properly. One powder may fit a destination while falling outside its file, and the paperwork is part of what is being bought. Commercial terms appear on the quotation, not here.

The sample should carry a lot code

Use the 1 kg pack for qualification. Test protein, peptide content, ash, moisture and microbiology before scaling up, and keep part of the same pack as the retained sample. The lot code must be identical on the sample, the certificate and the quotation; without that link the material is only a demonstration.

If a bench trial needs less than a kilogram, ask before ordering. Repacked material from a larger lot carries a new traceability chain, and it should be labelled as a repack rather than presented as the catalog pack. A bench sample and the production drum are not guaranteed to share a lot.

Terms to settle early

The offer fixes the trade terms, the Incoterm, the pack size, the delivery window and the paperwork. Quality terms belong alongside: the specification revision, a certificate for each lot, the sample kept on file, the retest interval and the change-approval route. Agree a quality agreement before the first production order rather than after the first disagreement.

Returns and replacements follow the offer and the quality agreement. If a lot misses the agreed specification, resolve it through the retained sample and a joint re-test rather than a photograph. Agree in advance who pays for the referee laboratory and which one both sides accept.

The product page carries the catalog specification. Release tests are listed on the COA page, market files on the compliance page, and the term itself in the MOQ glossary entry. The quality page describes the release file.

Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.

Request a quotation