04 MOQ & ordering

Zinc oxide: MOQ, packaging and ordering

Technical document 04 · Reviewed 2026-11-19 · Zinc Oxide

On this page
  1. Why the minimum is 1 kg
  2. Packs and formats
  3. Lead time and dispatch
  4. What a quotation needs
  5. A sample that carries its lot code
  6. Terms to settle before the first order

The minimum order is 1 kg in a foil pouch and the production pack is a 25 kg fiber drum; standard dispatch runs 1–7 days from order confirmation. A quotation becomes comparable only when it names the grade, the specification, the pack, the destination and the documents. At about 79% zinc, a kilogram is far more zinc than a trial consumes, so the minimum is better read as the smallest sealed and labelled lot rather than as a volume threshold.

In one line

A kilogram of oxide carries about 790 g of zinc, so the minimum is a traceability unit rather than a volume threshold.

Why the minimum is 1 kg

One kilogram of this oxide contains roughly 790 g of elemental zinc. A bench trial uses grams, and even a pilot batch rarely needs the whole pack, so the figure that matters is not how much material the minimum delivers but what the pack can prove. It is the smallest unit that can be filled, sealed, given a lot code, sampled and retained as one identity.

Repacking below that unit is possible, but it moves the material out of the manufacturer's pack and into someone else's. A split has no original seal and no original lot code, and any claim about the lot has to be rebuilt from records. The 25 kg drum is the production unit: it cuts handling per kilogram and ties the buyer to one lot for the length of the run.

Packs and formats

Zinc oxide packs and what each one is for
PackFillUsed forHandling
Foil pouch1 kgFirst order, trial batch, retainKeep sealed; the foil is the moisture barrier
Fiber drum25 kgProductionLiner closed; record the opening date
GranulatedOn requestFilling lines that need flowLess dust; the mesh line changes
SplitOn requestLaboratory trialA repack from a bulk lot, documented as such

The catalog powder passes a 40 mesh sieve. Granulation is a separate physical specification rather than a packing variant, and it can move the dispatch date. A filling line that needs a coarser, less dusty powder should say so before the quotation is built, because the specification changes with the mesh.

Lead time and dispatch

Standard dispatch is quoted at 1–7 days after the order is confirmed. Picking, documents and handover to the carrier sit inside that window; the transit, the customs entry and the buyer's own release do not. A granulated grade or a split pack is quoted with its own date.

The dispatch date is worth asking for separately from the lead time. A drum ships on a pallet and a pouch ships as a parcel, and the Incoterm decides who books which. The certificate and the packing list should leave with the lot; a document pack that follows a week later delays the release at the other end.

What a quotation needs

A quotation can be compared only if it answers six questions:

  1. Which grade. Supplement, feed, pharmacopoeial or technical, written out rather than implied by an assay.
  2. Which limits. Assay and zinc on a named basis, the per-element lead result, moisture and mesh.
  3. Which pack. Pouch, drum, granulated or split.
  4. Where it goes. Country, address or port, and the trade term.
  5. Which paperwork. COA, TDS, SDS and any statement the importer has asked for.
  6. What it is for. Supplement, food, feed or another use, and the market of sale.

An offer that quotes an assay without a grade leaves the most important line open, because a pigment lot and a supplement lot can share the same assay figure. Commercial terms are given in the quotation and are not published here.

A sample that carries its lot code

The pouch is a qualification unit. Before the first drum, test identity by IR, the assay and the zinc figure, moisture, lead and the sieve result on the pouch, and hold back material from that same pack as the retain. Sample code, certificate and quotation should carry one lot number.

If the project needs only grams, ask for a split and note what it is. A split and the later drum may come from different lots, so a result on the split is an indication of the material, not a release of the drum.

Terms to settle before the first order

Commercial terms sit in the quotation: the trade term, the pack, the dispatch window and the document list. The quality terms sit next to them, and they are worth writing down before the first production order: the specification revision, the certificate per lot, the retain, the retest period, and the notice route for a change of source, grade or pack.

A failed lot is settled on evidence, not on a photograph. Agree in advance which retained sample is used, which laboratory arbitrates and who pays for the referee work, and put the answer in the quality agreement.

The catalog specification is on the zinc oxide product page; the release tests are listed on the COA page; the market file is on the compliance page; storage is on the stability page; the glossary entry for MOQ defines the term; the quality page describes the release workflow.

Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.

Request a quotation