04 MOQ & ordering

Selenium yeast: MOQ, packaging and ordering

Technical document 04 · Reviewed 2026-11-19 · Selenium Yeast

On this page
  1. Why the minimum is one kilogram
  2. Packaging
  3. Lead time
  4. What the quotation needs
  5. Samples
  6. Payment, claims and terms

Selenium yeast is supplied from 1 kg, drawn from a released lot and accompanied by that lot's certificate. The 1 kg foil pouch is the qualification pack; the 25 kg fiber drum is the production pack. Lead time is 1–7 days from confirmation of specification and order, and a quotation is only complete when grade, quantity, pack, destination and documents are settled.

In one line

One kilogram is a qualification unit drawn from a released lot, not a retail pack.

Why the minimum is one kilogram

One kilogram of a 2,000 mg/kg grade carries about 2 g of selenium. At a 200 µg daily dose that is 10,000 doses; at 55 µg it is more than 36,000. The same kilogram of a 1,000 mg/kg grade carries 1 g of selenium, or 5,000 doses at 200 µg. That is enough for a pilot encapsulation or tableting run, a short stability study and a reserve sample, which is what a first order is for.

The minimum is a packing and documentation unit, not a volume break. A larger order is filled from the same released lot when the lot is large enough; when it is not, a new lot is raised and a new certificate is issued. The certificate always belongs to the lot that fills the drum.

Packaging

Standard packs · selenium yeast
PackUseNotes
1 kg foil pouchTrial, sample, small batchSealed food-grade liner; product, grade and lot on the label
25 kg fiber drumProductionLined drum, tamper-evident closure, lot label visible

The liner is the surface that meets the powder, so a torn liner or an unsealed drum changes the storage condition regardless of the label. A humid destination can be handled by adding a desiccant to the packing specification at the order stage. Every pack should carry the product name, the selenium grade, the net mass, the lot and the storage condition. If those details cannot be matched to a certificate, traceability has already failed.

Open and close both formats in the same dry area. The pouch is a working pack, not a retail pack, and should be resealed between weighings; the drum liner should be closed down rather than left open.

Lead time

The quoted window is 1–7 days measured from confirmation of specification and order. The clock begins when grade, quantity, packing and paperwork are settled, not at the first enquiry. A speciation report, an outside micro test or a granulation step adds its own time, shown separately on the quotation.

Three things commonly move the date: a specification edited after confirmation, a document requested late in the process, and a destination rule that needs an additional test. Raising all three in the first exchange protects the date better than chasing it later. If there is a launch date, it belongs in the brief, not in a follow-up email.

What the quotation needs

A useful enquiry answers six questions:

  1. Which selenium grade is wanted — 1,000 or 2,000 mg/kg — or which specification is being matched?
  2. What is the first-order quantity, and what volume is expected across a year?
  3. Which dosage form will carry the powder — capsule, tablet, stick pack, drink mix or other?
  4. Which destination market, and which documents does it require?
  5. Which tests must be on the certificate: protein, moisture, mesh, speciation, micro?
  6. Is there a delivery or launch date that cannot move?

A competitor's certificate can replace a written brief at the start, because it shows the tests and limits the buyer already uses. Send it and the reply will be a counter-specification: what can be met, what cannot, and what needs a trial.

Samples

A sample is taken from a released lot and travels with that lot's COA. Ask for the grade the trial will run — 80 mesh, granulated or diluted — not a different presentation, or the trial will answer a different question. A sample without a certificate is a demonstration, not a qualification.

The quantity should follow the trial protocol: enough capsules or tablets for the run plus a reserve, and enough powder for a moisture and selenium check. Keep part of the sample as a reference so the trial result can later be compared with the production lot.

Payment, claims and terms

Payment terms, Incoterm and documentary requirements are confirmed in the order paperwork. Destination, quantity and whether the account is new all affect them, so no single website statement can cover every order.

Claims are checked against the retained sample and the lot certificate. Report damage or a shortfall when the pack is opened, with photographs of the pack and its lot label, so the report can be tied to the lot record. The purchase order should carry grade, mesh, pack and documents; the specification is the annex against which the certificate is checked.

The COA page sets out what the certificate contains; the grade page shows what a grade change does to the order; the logistics page covers movement and documents; the quality page describes the lot record. The product hub is selenium yeast.

Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.

Request a quotation