Phosphatidylserine: MOQ, packaging and ordering
The minimum order is 1 kg, drawn from a released lot and packed in a 1 kg foil pouch; the 25 kg fiber drum is the production pack. Lead time for the catalog grade is 1–7 days. A quotation needs six details: grade and source, quantity and pack, destination and Incoterm, the document set, the label requirement, and whether a sample or stability data is part of the request.
One kilogram drawn from a released lot is the qualification unit; the pack, the source and the destination shape the order.
Why the minimum is 1 kg
A kilogram is enough to run a real trial: a lab-scale capsule or stick batch, a homogeneity check, a stability pull and a retained sample. It is not enough to launch a product, and it is not meant to be. The unit exists so a formulator can test the powder on the actual line before committing to a drum, and so a buyer can compare two lots or grades on the same tests without ordering 25 kg of each.
The kilogram is cut from a released lot, not blended for the sample. That matters because the sample then carries the same lot code, the same certificate and the same history as the production material. Ask for the lot number on the pouch and on the COA, and keep a portion of the sample as the retained sample for later comparison. When the order moves to a drum, the lot may change; the certificate for the drum is the one that governs that shipment.
The 25 kg drum is the economic unit for production. It reduces handling and packaging per kilogram, and it is the pack the stability study should cover if the material will be stored in it. A buyer who validates on a pouch and then receives a drum is testing a different pack.
Packaging
The catalog packs are a 1 kg foil pouch and a 25 kg fiber drum. The pouch is the unit for trials and small batches; the drum is the production pack. Both should be sealed, labelled and traceable to the lot. The pouch needs a moisture barrier because the powder is hygroscopic, and the drum needs an inner liner that keeps the powder away from the fiber wall and the closure.
The label should carry the product name, the grade and PS content, the source, the lot code, the net weight, the storage condition and the allergen statement. If the material is soy-derived, the soy declaration belongs on the pack as well as on the certificate. A pack that arrives with a handwritten lot number or no source statement is a documentation problem before it is a quality problem.
Ask how the pack is closed and how it is opened. A pouch that has to be cut open cannot be resealed, and a drum opened in a humid room picks up moisture every time it is sampled. A liner tie, a desiccant where the climate requires one, and a written closing routine are practical controls.
Lead time
The catalog grade is quoted at 1–7 days, which reflects material held as released stock rather than a production slot. A 20% or 70% grade, a granulated cut, a non-catalog source or a document set that has to be prepared for a new market can take longer, and the order confirmation should carry the date that applies. Transit time is separate from lead time; the quotation should state which one is being quoted.
Two things commonly move the date. The first is documentation: a certificate, an allergen statement or a specification review for a new customer can take longer than the material. The second is the pack: a drum that has to be lined, labelled or palletised for a particular destination is not the same dispatch as a pouch. Give the destination and the document list at the enquiry stage.
Do not plan a launch on the shortest quoted lead time. Plan on the confirmed date, and keep a buffer for the customer's own release testing. The COA page describes the tests the receiving laboratory is likely to repeat.
What a quotation needs
| Detail | What to state | Why it changes the quote |
|---|---|---|
| Grade and source | 50% catalog grade or 20%/70% on request; source stated in writing | Different powder, specification and document set |
| Quantity and pack | Kilograms, pouch or drum, number of packs | Pack size changes handling and dispatch |
| Destination and Incoterm | Country, port or address, who arranges freight | Freight, documents and transit differ |
| Documents | COA, specification, SDS, allergen, source, novel-food status | Some files are prepared per market |
| Label | Customer label, language, lot and storage fields | Labelling is a production step |
| Sample or stability | 1 kg trial, retained sample, stability data request | Adds a lot reservation or a data pull |
The most common gap is the document list. “Send the COA” can mean the batch certificate, the specification, the SDS or the full regulatory pack, and the four are different jobs. Name the market and the customer's checklist at the enquiry stage. The compliance page lists the documents a food-supplement file usually needs.
The second gap is the grade. A quotation for a 50% soy powder does not cover a 70% grade or a different source. If the project is still comparing grades, ask for both lines separately so the difference is visible rather than averaged into one number.
Samples
A sample should be a 1 kg pouch from a released lot, with the lot's certificate and the specification. Test it on the parameters that matter to the formula: PS by HPLC-ELSD, peroxide value, acid value, loss on drying, particle size and appearance. Keep part of it sealed and retained so a later dispute can be checked against the material that was actually evaluated.
Ask whether the sample lot will also be available for the first order. If it will not, the trial is still useful, but the first production lot needs its own release tests and its own certificate. A sample that arrives without a lot code cannot be traced back to a batch, and a sample that arrives with a different specification from the quotation is a change-control issue before it is a quality issue.
Terms to settle before the order
The commercial terms belong in the quotation and the order confirmation: the Incoterm, the payment terms, the documents that travel with the shipment, and the shelf life remaining at dispatch. The quality terms belong in a specification or a quality agreement: the release tests, the acceptance limits, the sampling plan, the retained sample period and the procedure for a non-conformance.
Change control is worth a line of its own. A change of lecithin source, carrier, mesh or manufacturing site can change the certificate and the label, and the customer should be told before the change ships, not after. Ask how changes are notified and how much notice is given. The phosphatidylserine hub carries the catalog specification; the grade page explains what a grade change does to the dose, and the MOQ glossary entry defines the unit.
Related documents
Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.
Request a quotation