04 MOQ & ordering

Zinc lactate: MOQ, packing and lead time

Technical document 04 · Reviewed 2026-11-19 · Zinc Lactate

On this page
  1. Why the minimum is 1 kg
  2. The standard packs
  3. How the 1–7 days is counted
  4. Six details for a quotation
  5. A sample has to carry a lot
  6. Terms to settle first

Zinc lactate is ordered from 1 kg: a foil pouch taken from a released lot, carrying that lot's certificate. Production moves to the 25 kg fiber drum. The 1–7 day dispatch clock starts when the specification and the order are confirmed, and a firm quotation needs the hydrate, the quantity and pack, the destination and the documents.

In one line

The 1 kg pouch is the smallest unit we can release and trace as a lot; the 25 kg drum is the production pack.

Why the minimum is 1 kg

A single kilogram is enough for formulation trials, a short stability pilot and a first production run. The pouch comes from a released lot, so the trial material and the certificate are a matched pair. The figure is not a volume threshold. It is the smallest unit that can carry a lot label, a sample record and a certificate.

Anything smaller is normally taken from a larger lot and repacked. That adds handling, discards the original pack identity and leaves a retained sample that no longer matches the pouch. The chemistry is unchanged; the traceability is not, and traceability is what a quality team audits. At 25 kg the fiber drum is the bulk pack: less handling per kilogram, but more inventory and a longer storage period.

Name the hydrate in the first message. This catalogue line is zinc lactate trihydrate, CAS 16039-53-5, 21.0–23.0% zinc and 17.0–19.0% water. The anhydrous salt carries more zinc per gram and has its own water limit, so a trial on the wrong hydrate certifies nothing.

The standard packs

Standard zinc lactate packs
FormatFillWhere it fitsWhat to watch
Foil pouch1 kgTrial, sample and small batchMoisture barrier; close it after opening; lot label on the pouch
Fiber drum25 kgProductionFood-grade liner; lot code on both drum and liner
Milled powderOn requestFiner mesh for capsules or suspensionsParticle size and dust both change
Granulated gradeOn requestFlow and dust managementBinder declaration; altered flow

The liner is part of the pack specification. Once it is open, the drum is no longer the pack that was studied, and the certificate cannot show the difference. In a humid destination, request a desiccant and write it into the packing specification. Every pack should carry the product and hydrate, the lot code, the net weight, the certificate reference and the storage condition.

How the 1–7 days is counted

Dispatch is quoted at 1–7 days from confirmation of the specification and the order. The count begins only when hydrate, quantity, pack and documents are fixed; a question against a draft specification is not an order. That window covers picking, paperwork and handover to the carrier. Transit, customs and the customer's quality release sit outside it.

Four things extend the window: a finer mill, granulation, an outside test, and destination paperwork such as an origin certificate or a translated label. Name them in the first message so the quotation can show the extra days. Ask for a dispatch date rather than a lead time alone. A drum usually moves on a pallet and a pouch as a parcel; the Incoterm fixes who books the freight and clears the entry.

Six details for a quotation

  1. Product and hydrate. Zinc lactate trihydrate, CAS 16039-53-5, spelled out in full.
  2. Specification. The assay and its basis, zinc, water, mesh, contaminants and microbiology.
  3. Volume and format. The 1 kg pouch, the 25 kg drum, or a milled or granulated grade.
  4. Destination and Incoterm. Where it is going and on which trade term.
  5. Documents. The certificate, technical data sheet, safety data sheet and any importer statement.
  6. Intended use and market. What it will be used for, and where it will be sold.

A quote that omits the hydrate or the market cannot be compared. One destination may accept a powder that another destination's file does not cover, so the paperwork is part of the offer. Commercial terms follow the confirmed order and are not listed here.

A sample has to carry a lot

The 1 kg pouch is the qualification sample. Before scaling, test identity, assay, zinc, water and microbiology, and retain a portion from the same pouch. Sample, certificate and quotation should share a lot code. Without that link, a sample is a demonstration rather than a qualification.

A smaller bench quantity can be discussed before the order. Material split out of a bulk lot is repacked, with its own traceability; it is not the catalogue pouch and should be recorded that way. Never assume the bench sample and the production drum share a lot. A sample offered for a milled or granulated grade has to be that grade; the 40 mesh powder will not qualify it.

Terms to settle first

The quotation states the commercial terms, the Incoterm and pack, the lead time and the document list. The quality terms sit alongside: specification revision, certificate per lot, retained sample, retest period and change control. Settle the quality agreement before production starts, not after a dispute.

Returns and replacements are governed by the quotation and the quality agreement. If a lot fails the agreed specification, resolve it on the retained sample with a joint re-test, not with a photograph. Agree who pays for the referee test and which laboratory both sides accept.

The product hub holds the catalogue line; the COA page lists the release tests, the compliance page covers the market paperwork, the methods library explains the titration and water methods; the quality page describes the lot record and the retained sample.

Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.

Request a quotation