Dried ferrous sulfate: MOQ, packaging and ordering
Dried ferrous sulfate starts at 1 kg in a foil pouch; production runs in a 25 kg fiber drum, and the standard lead time is 1–7 days from confirmation. A firm quotation needs the article and CAS number, the iron and loss-on-drying windows, the quantity and container, the delivery point and Incoterm, the documents, and the market where it will be sold.
One kilogram is the entry point because a single pouch is the smallest unit that can be tested, retained and traced under one lot code.
Why the minimum is 1 kg
The 1 kg pouch covers a new-lot qualification: identity, iron by titration, loss on drying, ferric iron, microbiology, a bench batch and a retained sample. No smaller split keeps the lot code, the certificate and the retained sample together. Below that size, powder is normally divided out of a larger lot, which adds handling and breaks the link between the sample and the pack.
Weight is the unit of sale, so the iron per kilogram depends on the grade: about 310 g in a kilogram of the dried article at 31%, and about 201 g in a kilogram of the heptahydrate at 20.09%. A 5 kg iron requirement is therefore about 16 kg of the dried article or 25 kg of the heptahydrate, before process loss.
The 25 kg drum cuts handling per kilogram, but it ties up inventory and lengthens storage. The minimum is about the pack, not about pushing volume.
Packs and formats
| Pack | Net weight | Typical use | Notes |
|---|---|---|---|
| Foil pouch | 1 kg | Trial, sample, small batch | Moisture and light barrier; heat-sealed |
| Fiber drum | 25 kg | Production | Inner liner; lot code on drum and liner |
| Powder, 80 mesh | 1 kg or 25 kg | Capsules, tablets, blends | The standard catalog form |
| Granulated powder | On request | Flow and dust control | Particle profile changes; separate specification |
At 1 kg, the foil is the barrier and the seal is where it fails. Folding an opened pouch does not restore a heat seal, and the air inside has already changed. A drum's barrier is its liner: keep it tied, stand the drum on a pallet, and write down the first opening date. The pouch, the liner and the certificate should carry one lot code.
The catalog powder passes 80 mesh; granulation is a separate quote. A new mesh, a granulation or a dilution is a new specification, not a packing variant, and a coarser or faster-flowing powder can add sieving time, so raise it before the quote.
From confirmation to dispatch
The 1–7 day window covers picking, documents and handover; transit, customs and the buyer's release sit outside it. A granulated grade, a custom mesh or a special pack carries its own timing.
Get a dispatch date, not only the lead time. The drum travels on a pallet and the pouch as a parcel, and the Incoterm says who books freight and clears entry; the documents should travel with the lot.
What a quotation needs
Six details make quotes comparable:
- Article. Dried ferrous sulfate, CAS 7720-78-7, with the hydrate named.
- Limits. Iron, loss on drying, identification, mesh, heavy metals, microbiology and any ferric limit.
- Pack and quantity. Foil pouch (1 kg), fiber drum (25 kg), powder or granulated.
- Delivery point and Incoterm. The country, address or port, and the trade term.
- Documents. COA, specification, SDS and any destination-specific statement the importer needs.
- Intended use and market. Supplement, food or another application, and the country where it will be sold.
A quote without the hydrate names a family, not an article: the same family covers a 20% iron hydrate and a 30–33% iron dried powder, and one does not substitute for the other on a label or in a fill. Commercial terms are set out in the quotation, not here.
What the first pouch qualifies
Qualification starts with the 1 kg pouch: check identity, iron, loss on drying and microbiology before scale-up, and add a ferric result if the powder will be stored. Keep material back from that pouch; if the sample, the COA and the quote carry different lot codes, the work is a demonstration, not a qualification.
A smaller bench trial needs a separate request: material split from a drum becomes a repack with its own traceability and should be recorded as such. The bench sample and the later production drum may come from different lots.
Terms to agree before ordering
The quotation should set commercial and quality terms side by side: Incoterm, pack, dispatch window, specification revision, a COA per lot, the retained sample, the retest period and the change route. Put those into a quality agreement before the first production order; the conversation is harder after a dispute.
A failed lot is settled on the retained sample by a joint re-test on the named method; a photograph of the drum settles nothing. Both documents should name the referee laboratory and say who pays for it.
The product hub carries the catalog specification; the COA page sets out the release tests; the compliance page covers the market files; the MOQ glossary explains the term; the logistics page covers freight and documents.
Related documents
Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.
Request a quotation