Iron pyrophosphate: MOQ, packaging and ordering
The minimum order is 1 kg, packed as a foil pouch and drawn from a released lot; production quantities ship in 25 kg fiber drums. The quoted lead time is 1–7 days for material in stock, measured from confirmation of grade, pack and destination. A quotation is built from six details, and the sample is the same released material in the smaller pack.
A kilogram is enough to qualify the powder, the 25 kg drum is the production pack, and the grade, quantity and destination decide how the order is quoted.
Why the minimum is one kilogram
The first kilogram is for qualification, not for stock. It covers bench work, a pilot fill or compression run and a short stability check, and it is drawn from a lot that has already been released, so trial powder and certificate belong to the same production batch.
The kilogram is a packing and documentation unit, not a bulk threshold. A larger order is filled from the same lot where the lot allows; otherwise a new lot is raised and carries a new certificate. The minimum exists so that a formulator can test the real material without buying a drum.
Packs and what they protect
| Pack | Use | Notes |
|---|---|---|
| 1 kg foil pouch | First trial, sample, small run | Sealed food-grade liner; name, grade and lot printed on it |
| 25 kg fiber drum | Production | Lined drum with a tamper-evident seal; lot label outside |
| Granulated, on request | Process-specific | Mesh and density agreed at the order stage |
The liner is what the powder actually touches. A pierced liner or an unsealed drum changes what the powder sees, whatever the label claims. For a humid destination, add a desiccant to the packing specification when the order is placed. Every pack should carry the product name, grade, net mass, lot and storage condition; if those details do not line up with a certificate, traceability has already broken down.
Handle both packs in a dry area, and close them promptly. The pouch is built for use, not for retail, and needs resealing between weighings; fold the drum liner closed instead of leaving it open.
Lead time and what starts the clock
The window is 1–7 days from confirmation, and confirmation means grade, quantity, pack and paperwork agreed. A non-standard mesh or a granulated lot is scheduled before it is packed, and an outside laboratory test adds its own time; both appear separately on the quotation.
Three things usually move the date: a specification changed after confirmation, paperwork asked for at the last minute, and a destination rule that requires a licence or an additional test. Settling all three at the start saves the date; chasing them later rarely does. If there is a launch date, it belongs in the brief rather than in a follow-up message.
Six details a quotation needs
| Detail | Why it changes the offer |
|---|---|
| Material and grade | Micronized 200 mesh, or a granulated grade with its mesh and density |
| Quantity | First order and expected annual volume set the lot and the pack |
| Pack | Pouch, drum or a mix; a desiccant is a packing decision |
| Destination and Incoterm | Country, address and delivery term decide the documents and the route |
| Documents | COA, specification and SDS, plus any statement the market requires |
| Required date | The date the material is needed, not the date the purchase order is raised |
At the enquiry stage a competitor's certificate does the work of a written brief, because it lists the tests and limits the buyer already works to. Send one and the answer can be a counter-specification: what matches, what cannot, and what would need a trial.
Samples and the trial
Samples come out of a released lot and carry that lot's certificate. Ask for the grade the trial will run — 200 mesh, granulated or a specific density — or the trial will answer a different question from the one the production order asks.
Size the sample against the trial protocol: enough for the panel and a reserve. Retain part of the sample as a reference, so a later trial result can be set against the production lot. Without a certificate, a sample is a demonstration rather than a qualification, and a sample drawn from another lot is a different material as far as traceability is concerned.
Terms to settle before the purchase order
Four terms belong in the order paperwork from the start: the specification version, the certificate for each lot, the retention sample and the remaining shelf life on arrival. Add the quantity tolerance, the rejection window and the route for a damaged pack.
Payment terms and the Incoterm are confirmed in the order, because destination, quantity and account history all affect them; no website statement covers every order. A grade change after the purchase order is a change control rather than a note on the packing list, and it should be quoted and scheduled as one.
Any damage or shortfall should be reported at opening, with photographs of the pack and of the lot label, so the claim can be tied to the lot record.
The specification is on the iron pyrophosphate product page. The COA page sets out what arrives with the lot; the grade page shows what a grade change does to an order; the compliance page sets out the documents a market may request. The terms are defined in the MOQ and lead-time entries, and the lot record is described on the quality page.
Related documents
Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.
Request a quotation