04 MOQ & ordering

L-Tryptophan: MOQ, packaging and ordering

Technical document 04 · Reviewed 2026-11-19 · L-Tryptophan

On this page
  1. Why the minimum is a kilogram
  2. The two packs
  3. Lead time, and what moves it
  4. The six details a quotation needs
  5. Samples, and what a sample should carry
  6. What the order terms cover

The minimum order is 1 kg, packed as a foil pouch and drawn from a released lot, so the smallest order still carries a lot number, a full certificate and a retained sample. Above that the pack is a 25 kg fiber drum, and the lead time is 1–7 days for material in stock. What a quotation needs from the buyer is six details, and the specification revision is the one most often left out.

In one line

The 1 kg pouch is the smallest unit that still comes with a lot number and a full certificate, which is why the minimum order starts there.

Why the minimum is a kilogram

The minimum is set by the paperwork, not by the powder. Every lot is released against a full panel — identity, assay, rotation, related substances, loss on drying, metals, microbiology, particle size — and the cost of that panel sits on the lot rather than on the kilogram. A 1 kg draw lets a formulator qualify a source, run a capsule or blend trial and keep a retention sample, while the lot still has one certificate behind it.

Below a kilogram, the handling and documentation cost more than the material, and the buyer usually ends up with a subdivided sample that has lost its lot identity. The 1 kg pouch is therefore the practical floor: it is a released unit, it is labelled, and it can be traced back to the certificate.

The minimum does not change with the physical form. A milled or granulated 1 kg is still 1 kg; the finishing step is quoted with it, not as a separate minimum.

The two packs

The 1 kg pack is a foil pouch. The foil is the light barrier, and it also limits moisture ingress, which matters for a powder specified at 0.5% loss on drying or less. The pouch carries the product name, the CAS number, the lot code, the net weight and the storage statement, so the pack and the certificate can be matched without opening anything.

The 25 kg pack is a fiber drum with a food-grade liner. It is the unit for a production run, and it is closed and sealed for transport. The liner is part of the specification: a drum without a food-contact liner is a different pack, whatever the outside says.

Packs and what they are for
PackTypical useWhat it protects
1 kg foil pouchQualification, trial batches, small launchesLight, moisture, lot identity
25 kg fiber drum, linedProduction runs, repeat ordersLight, moisture, handling damage

Pack sizes are not the place to economise on a light-sensitive powder. A clear bag inside a drum, or a pouch left open between weighings, gives away the protection the specification was written to guarantee. The storage and handling statement on the logistics page follows the same logic.

Lead time, and what moves it

A stock lot is released and dispatched in 1–7 days. The range exists because the clock starts at the order confirmation: a lot that is already released and packed moves on the short end, and one that needs a certificate re-issue or a label change takes the longer end. The 1–7 days is dispatch, not arrival; transport time depends on the destination and is quoted separately.

Two things reliably add time. The first is a finishing step: milling to 80 mesh or granulating a lot is a separate operation and is scheduled after the order. The second is a document that does not exist yet — a customer-specific specification, a private-label artwork check, or a statement the destination market requires. Ask for those before the order, not after it.

The six details a quotation needs

A quotation is only as good as the brief behind it. Six details cover almost every case:

  1. Material and form. L-tryptophan, CAS 73-22-3; if a racemic material is intended, say so, because it is a different product and a different label ingredient.
  2. Quantity and pack. Kilograms, and whether the order is pouches, drums or a mix.
  3. Specification revision. The version you are buying against, plus any parameter to add — a related-substance limit, a tighter rotation, a milled particle size.
  4. Destination and delivery term. The country of import and the Incoterm decide the documents and the freight.
  5. Document set. Certificate, specification, allergen, GMO and irradiation statements, food-grade declaration, safety data sheet — name the list you need.
  6. Date required. The date the material has to be at your site, not the date you would like it dispatched.

Most delays trace to item three. A buyer who sends a quantity and a product name, but not the specification revision, gets a quotation against the catalog specification, and the gap surfaces at goods-in.

Samples, and what a sample should carry

A sample is drawn from a released lot, sealed in a small light-protective pack, and sent with the lot number and the matching certificate. It is not a scoop from the top of a drum: the value of a sample is that it is the same material, from the same lot, as the delivery it precedes.

Keep the sample. When the first drum arrives, the retained sample and the delivered material can be compared side by side on appearance, on rotation and, if needed, on a chromatogram. A sample without a lot number cannot do that, and a certificate without a sample leaves the comparison to memory.

Sample size and dispatch are agreed with the quotation; the material cost of a small sample is not the point, the lot identity is.

What the order terms cover

The fixed part of an order is short: minimum 1 kg, the pouch or the lined drum, the 1–7 day dispatch for stock, the certificate and the document set released with the lot, and a retained sample held against the delivery. The variable part is the specification revision, the finishing step, the destination and the document list.

Order changes cost least before the lot is packed. Once a pouch is labelled or a drum is sealed, a change to the pack or the artwork becomes a re-pack, and a change to the specification may need a new certificate. Send changes in writing and confirm the revision number on the order acknowledgement.

The price is not published on this page; it is quoted against the six details above. The lines that the certificate will show are on the COA page, the form decision is on the grade page, and the documents a regulated market expects are on the compliance page. The catalog specification is on the product page, and an enquiry can be started from the contact page.

Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.

Request a quotation