L-Citrulline: MOQ, packaging and ordering
L-citrulline ships from 1 kg: a foil pouch filled from a released lot, with that lot's certificate in the box. The standard drum is 25 kg, the lead time is 1–7 days from released stock, and a quotation becomes usable when it names six things. Below 1 kg what is lost is traceability, not material.
One kilogram from a released lot with that lot's certificate is the minimum; mesh, pack, quantity and destination decide the rest.
Why the minimum is 1 kg
A 1 kg minimum is a working minimum, not a marketing number. It is enough for a bench trial, a capsule fill run, a stability pull and a retained sample, and it is drawn from a lot that has already been released, so the certificate in the box matches the powder in the bag. Smaller repacks are possible, but each one is a new container, a new label and a weaker link to the lot, and a buyer who needs 200 g usually needs a sample rather than a purchase.
The next step is the 25 kg drum, the unit that travels without repacking and keeps one lot code from the drum label to the customer's batch record. Between 1 kg and 25 kg the material is the same; what changes is how many times it is handled and how many labels stand between the manufacturer's release and the production floor.
Packs and what each one protects
Both packs are chosen for water first. The amino acid is not deliquescent, but the specification holds loss on drying at ≤0.5%, and a pouch that is not sealed or a drum liner that is torn will let a lot drift toward that limit in a humid warehouse. The liner, not the board, is the barrier in the drum.
| Pack | Net weight | Closure | Typical use |
|---|---|---|---|
| Foil pouch | 1 kg | Heat-sealed foil laminate | Trial, sample, small batch |
| Fiber drum | 25 kg | Double polyethylene liner, lever lid | Production batch |
A drum that has been opened and reclosed is no longer a sealed unit. If a batch runs to the end of a drum, order a full drum rather than a part-used one, and ask for the liner to be closed between uses. The pouch is the better pack for anything that will be opened more than once.
Lead time and what moves it
Lead time is 1–7 days from released stock, counted from the moment the order and the specification are confirmed, not from the enquiry. Milling to 80 mesh and granulation are separate operations on the same lot and move the date. Documents issued with the lot, and any third-party test the customer asks for, sit on the same critical path.
If a production start fixes the date, say so at enquiry. A lot can be reserved against a confirmed specification; it cannot be reserved against a question. The other delay that recurs is the specification itself: a buyer who sends a purchase order referencing a catalogue page, rather than the certificate and its methods, often has to reissue it once the documents arrive.
The six lines a quote needs
A quote that omits any of the six is a range rather than an offer, and the gap usually surfaces after the order. The specification line causes the most rework, because two quotations can both say 99% and describe different measurements.
| Line | What to specify | Why it changes the offer |
|---|---|---|
| Product and form | L-citrulline, free amino acid | Separates it from a citrulline malate blend |
| Specification | Assay basis, rotation, limits, method | Defines which certificate applies |
| Particle size | 40 mesh standard, 80 mesh or granulated | Adds a milling or granulation step |
| Pack and quantity | Pouch or drum, number of units | Sets the handling and the lot split |
| Destination and term | Incoterm, port or door | Sets the route and who clears |
| Documents | COA, SDS, specification, statements | Some documents are issued per shipment |
Samples
A sample should be drawn from a released lot and travel with that lot's certificate and a label carrying the lot code. It answers identity, assay, rotation, water, pH, particle size and colour. It cannot answer flow at production speed, fill weight on a particular machine, or how the powder behaves after a week in the customer's warehouse; those need a trial on the line with the commercial pack.
Ask for the sample in the same pack type as the commercial material. A sample in a screw-top jar has already met more air than the drum will, and a caking result from that jar says more about the jar than about the lot.
Terms worth fixing in writing
Four terms belong in the first order. The specification and the method behind each limit, referenced to the certificate rather than to a catalogue page. The quantity tolerance and the pack, because a drum is filled by weight and the net figure has a tolerance. The Incoterm and the point at which risk passes. And a change-control clause: no change of mesh, route or manufacturing site without notice and a new certificate.
Add a retention clause and a shelf-life statement at shipment, and the set is complete. All of these decide whether the second order arrives as the first one did.
The catalog specification these lines refer to is on the L-citrulline product page; the release tests are on the COA page, and the form comparison is on the grade page. Packing, pallets and export documents are covered on the logistics page, and the minimum-order term is defined in the MOQ note.
Related documents
Send the specification you intend to use — grade, quantity and destination market — and we will reply with the batch COA, the technical data sheet and a quotation.
Request a quotation